Punch-list cost model

Every open item at final walk traced to the re-trip cost, the rework and the closing-delay carry it produces, against the checklist standard already written into the walk. Catch it before possession, not after.
$0.7M
Reference-scale value
6
Data sets in the model
6 wks
Build and deploy
Derived
Evidence grade
01

A checklist that says "pass" is a guess about what closing week costs

Every final walk already carries an open-item allowance — a number set once, in a checklist template, and never checked against what closing week actually costs. Nobody joins the walk findings to the trade invoicing system until the re-trip bill lands, so a heavy punch list shows up as a scramble at closing, not a QA decision made before the crew leaves site.

Every over-threshold home compared against the standard the checklist already promised. The gap is traced to a driver — a re-trip charge, a materials line, a closing delay — so a superintendent can escalate this week, not explain a closing-week scramble after the fact.

$272,000 · addressable
Trade re-visit and re-mobilization cost

A second trip billed to close out a punch-list item beyond the checklist standard. The largest single driver.

$148,000 · addressable
Materials and rework cost

Replacement materials and rework for defects caught late at the final walk.

$124,000 · addressable
Closing-delay schedule carry

Days lost to possession when an unresolved item pushes the closing date.

$160,000 · not addressable here
Items missed pre-close, leaking post-close

Priced separately in the warranty recurrence model. Not double-claimed here.